Skip to content

Introduce FundingScope abstraction to ChannelMonitor #17383

Introduce FundingScope abstraction to ChannelMonitor

Introduce FundingScope abstraction to ChannelMonitor #17383

Triggered via pull request March 12, 2025 17:08
Status Cancelled
Total duration 5h 23m 44s
Artifacts

build.yml

on: pull_request
Matrix: build-tx-sync
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 1 warning
incremental-mutants
Process completed with exit code 2.
Continuous Integration Checks
Canceling since a higher priority waiting request for Continuous Integration Checks-refs/pull/3663/merge exists
fuzz
The operation was canceled.
fuzz
Canceling since a higher priority waiting request for Continuous Integration Checks-refs/pull/3663/merge exists
incremental-mutants
Cache not found for keys: v0-rust-incremental-mutants-Linux-64ffecfe-b7f287d6, v0-rust-incremental-mutants-Linux-64ffecfe