Bump electrum_client
dependency and add new TLS-backend features
#17321
Triggered via pull request
March 10, 2025 09:24
Status
Cancelled
Total duration
1h 14m 25s
Artifacts
–
build.yml
on: pull_request
ext-test
3m 30s
coverage
8m 8s
benchmark
18m 20s
check_commits
3m 6s
check_release
2m 26s
fuzz
1h 10m
linting
1m 31s
rustfmt
13s
incremental-mutants
21s
Matrix: build-tx-sync
Matrix: build
Annotations
20 errors
build-tx-sync (ubuntu-latest, 1.75.0)
Process completed with exit code 101.
|
build-tx-sync (macos-latest, beta)
Process completed with exit code 101.
|
build-tx-sync (macos-latest, 1.75.0)
Process completed with exit code 101.
|
build-tx-sync (ubuntu-latest, beta)
Process completed with exit code 101.
|
build-tx-sync (ubuntu-latest, stable)
Process completed with exit code 101.
|
build-tx-sync (macos-latest, stable)
Process completed with exit code 101.
|
build (windows-latest, beta)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3587/merge' exists
|
build (windows-latest, beta)
The operation was canceled.
|
build (windows-latest, stable)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3587/merge' exists
|
build (windows-latest, stable)
The operation was canceled.
|
fuzz
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3587/merge' exists
|
fuzz
The operation was canceled.
|
build (ubuntu-latest, stable)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3587/merge' exists
|
build (ubuntu-latest, stable)
The operation was canceled.
|
build (ubuntu-latest, 1.63.0)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3587/merge' exists
|
build (ubuntu-latest, 1.63.0)
The operation was canceled.
|
build (macos-latest, stable)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3587/merge' exists
|
build (macos-latest, stable)
The operation was canceled.
|
build (macos-latest, 1.63.0)
Canceling since a higher priority waiting request for 'Continuous Integration Checks-refs/pull/3587/merge' exists
|
build (macos-latest, 1.63.0)
The operation was canceled.
|