Skip to content

[breaking] multiple refactorings in preparation for deferring torrent metadata resolution #824

[breaking] multiple refactorings in preparation for deferring torrent metadata resolution

[breaking] multiple refactorings in preparation for deferring torrent metadata resolution #824

Triggered via pull request December 7, 2024 12:15
Status Failure
Total duration 1m 27s
Artifacts

test.yml

on: pull_request
Matrix: check-rust-compat
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 3 warnings
test (macos-latest)
Process completed with exit code 101.
test (windows-latest)
The job was canceled because "macos-latest" failed.
test (windows-latest)
The operation was canceled.
test (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
check-rust-compat (1.83)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
check-rust-compat (1.78)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636