Skip to content

UDMI Test Suite

UDMI Test Suite #10926

Triggered via schedule March 10, 2025 13:25
Status Failure
Total duration 21m 13s
Artifacts 14

testing.yml

on: schedule
Matrix: Sequencer Tests
Automapping capability
3m 6s
Automapping capability
UDMIS Local Setup
12m 31s
UDMIS Local Setup
Endpoint Redirection
10m 3s
Endpoint Redirection
Unit Tests
6m 44s
Unit Tests
Docs Spelling Checks
20s
Docs Spelling Checks
Discovery Tests
6m 47s
Discovery Tests
Post-test Summarization
42s
Post-test Summarization
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Sequencer Tests (2)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 20 minutes.
Sequencer Tests (2)
udmi version information not available
Sequencer Tests (2)
The operation was canceled.
Post-test Summarization
Process completed with exit code 1.
Post-test Summarization
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
udmi-support_13765795082
3.24 MB
udmi-support_13765795082-0
284 KB
udmi-support_13765795082-1
258 KB
udmi-support_13765795082-3
300 KB
udmi-support_13765795082-4
344 KB
udmi-support_13765795082-5
308 KB
udmi-support_13765795082-6
271 KB
udmi-support_13765795082-7
266 KB
udmi-support_13765795082-8
233 KB
udmi-support_13765795082-9
219 KB
udmi-support_13765795082-b
116 KB
udmi-support_13765795082-l
692 KB
udmi-support_13765795082-m
5.44 KB
udmi-support_13765795082-r
24.1 KB