Skip to content

fix(deps): update dependency ruff to ~=0.9.3 #278

fix(deps): update dependency ruff to ~=0.9.3

fix(deps): update dependency ruff to ~=0.9.3 #278

Triggered via push January 25, 2025 21:33
Status Failure
Total duration 1m 21s
Artifacts 1

tests.yaml

on: push
Matrix: integration
Matrix: unit
Fit to window
Zoom out
Zoom in

Annotations

18 errors and 1 warning
integration (ubuntu-22.04)
Process completed with exit code 255.
integration (macos-latest)
The job was canceled because "ubuntu-22_04" failed.
integration (macos-latest)
[notice] A new release of pip is available: 21.1.1 -> 24.3.1 [notice] To update, run: python3.8 -m pip install --upgrade pip
integration (macos-latest)
The operation was canceled.
integration (windows-latest)
The job was canceled because "ubuntu-22_04" failed.
integration (windows-latest)
The operation was canceled.
unit (ubuntu-22.04)
Process completed with exit code 255.
unit (ubuntu-22.04)
Failed to CreateArtifact: Received non-retryable error: Failed request: (409) Conflict: an artifact with this name already exists on the workflow run
integration (ubuntu-20.04)
The job was canceled because "ubuntu-22_04" failed.
integration (ubuntu-20.04)
The operation was canceled.
lint
Process completed with exit code 255.
unit (ubuntu-20.04)
The job was canceled because "ubuntu-22_04" failed.
unit (ubuntu-20.04)
The operation was canceled.
unit (windows-latest)
The job was canceled because "ubuntu-22_04" failed.
unit (windows-latest)
The operation was canceled.
unit (macos-latest)
The job was canceled because "ubuntu-22_04" failed.
unit (macos-latest)
The operation was canceled.
unit (macos-latest)
[notice] A new release of pip is available: 21.1.1 -> 24.3.1 [notice] To update, run: python3.8 -m pip install --upgrade pip
lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
test-results-ubuntu-22.04
5.39 KB