GSIP Tech Planning May 9, 2019
Joost van Ulden edited this page Jun 19, 2019
·
10 revisions
- Julien, Héryk (NRCan/RNCan)
- Laguë, Mark (NRCan/RNCan)
- Brodaric, Boyan (NRCan/RNCan)
- Bucknell, Mary (USGS)
- Boisvert2, Eric (NRCan/RNCan)
- Blodgett, Dave (USGS)
- Sondheim, Mark (NRCAN/RNCAN)
- Martin, Marie-Eve (NRCan/RNCan)
- Kreft, Jim (USGS)
- Kralidis, Tom (EC)
- van Ulden, Joost (NRCAN/RNCAN) [Chair]
This meeting will orient us all towards a common understanding of what is required of the technology that will underpin GSIP this FY.
It is anticipated that the technology will maintain its “proof-of-concept” status for this FY with potential for an operationalized implementation in the future.
- Relationship to SELFIE
- Brainstorm – 40min
- High-level use cases
- Roadmap
- Resourcing – 15min
- How much time does everyone has allocated to GSIP?
- Determine the available technical capacity
- Next steps – 5min
- Schedule demos (5 min each): GSIP-CAN (Heryk J), GSIP-US (Dave B), CHYF (Mark S), ECCC-WFS (Tom * K) (later this week???)
- Schedule requirements elicitation meeting (later this week???)
- GSIP Canada/US portion of SELFIE - Technical component of collaboration
- one implementation of many
- last year of contribution
- report at a high level to GC
- develop prototype LD system that crosses Canada/US border - Proof of concept
- FYE deliverable (March 31, 2020)
- technical integration
- data integration (stream segments)
- Primary: link stream networks - via hypermedia
- Secondary: link related things to stream networks (e.g. wells, aquifers, hydrometric stations)
- nodes, other jurisdictions should be able to spin up a node and linkages should be harvested...
- interfaces?
- API's?
- SPARQL endpoint off the table/optional
- harvest linkages via LD infrastructure (hypermedia)
- centralized link repository
- RDF on GitHub? Maintain own RDF files
- start with cross border rivers and aquifers
- interface to linkages? hypermedia document
- Joost to summarize high-level use cases and distribute
- Joost to follow up with meeting participants on item 3 of agenda
- Joost to schedule demos after May 20th
- Joost to schedule requirements elicitation meeting